SUBSEA 7 – EGP3B project

Location: Africa – Nigeria
Type of personnel: RAT & Diving
Support: VIKING FORCADOS
Date: 2012

SCOPE OF WORK
RAT: work on Riser installation project.
Diving: Installation of 3 large diameters welded launched risers in very shallow water (4.6m water depth), with the vessel positioned 150m away from the platforms.
– Installation of flanged risers, tee, wye and spools up to 28-inch diameter.
– One above water tie-in.
– 900,000 man hours with ZERO LTI.
– Approximately 1300 dives on different vessels.