NASR PHASE II

Location: Abu Dhabi
Type of personnel: Rigger, Rigger Foreman, Banksman, Crane Operator
Support: Barge: Asian Hercules III
Date: 2017

SCOPE OF WORK

General deck work and preparations for lifting and installing of three jackets – GTP, SP and AP in NASR field

General Deck:
Daily operation meetings
Tool Box Talks
Installing of boat landings
Installing of Yokohama’s (Fenders)
Installing of gangway’s
Mooring operations of HTV and Spacer Barge
Spooling winch operations for Gravity anchors of floating lines
Assist in deploying of Wave-riding buoy
Connecting and winch operations for all steering lines
Capture and supply rigging equipment to all AHT’s and HTV’s vessels
Launching of work boat for crew transfers and during lifting operations
Connecting of slings to Jib and A-frame hooks for lift of Jackets
Installing of recovery buoys on lifting slings
Forklift operations on quayside and AH III deck before departure to NASR field
Crane operations in port and in field

DESCRIPTION OF THE PROJECT

The Nasr Phase II Full Field Development Project, aimed at increasing the field’s oil production capacity to 65,000 barrels per day (bpd) from the existing capacity of 22,000bpd, is underway and is expected to conclude in the first half of 2019.
The Nasr field development forms part of Adma-Opco’s overall plan to fast track the development of its new fields including Satah Al Razboot (SARB) and Umm Lulu, and increase the company’s production capacity by an additional 270,000bpd.
The Nasr Phase II Full Field Development Project is being implemented under three separate engineering, procurement and construction (EPC) packages.